Latest
Evidence log checked through 2026-11-11Layout updated 2026-11-04

Latest — Can Canada keep its pension promises?

Follow the latest changes in the evidence, the checks that left a reading unchanged, and the questions still awaiting an answer. Each entry names its dates, limits and next relevant release. An unchanged reading means a check confirmed the earlier answer.

Latest

Latest — Can Canada keep its pension promises?

Evidence log checked through 2026-11-11; layout updated 2026-11-04

Full-text view: folded sections are expanded. Evidence dates and original wording are retained. Return to standard view

The topic filter applies to evidence readings below. Corrections and selected analyses cover the whole site.

How to read the clock → “Dated” is the original record date; the reading states its observation period. An evidence date is retained as recorded and does not by itself establish a publication or incorporation date. A layout change does not recheck the evidence.

Follow these updates · RSS feed

Selected analysis

Selected analysis · Analysis dated 2026-11-10

Budget 2026: where the money for new commitments came from

The deficit for this fiscal year is close to the spring forecast. Under that figure, the forecast improved by $158 billion over five years and new commitments used $152 billion of it. This page traces the figures through the budget’s own tables.

Read from Budget 2026 as published on November 10, 2026. Figures are the budget’s own projections, not results.

Selected analysis · Analysis dated 2026-10-21

Ottawa’s red-tape reset reaches far beyond paperwork

How Ottawa’s proposed changes could affect business restructuring, electricity storage, trade and development near airports.

Proposed changes, read from the first-reading bill. This is a dated analysis, not a current bill-status check.

Selected analysis · Evidence reviewed through 2026-10-25

British Columbia’s next growth test

Real output has more than doubled since the late nineties. Growth per resident is slower, the ports serve a national production base, and the pre-election fiscal plan leaves a large deficit.

The next post-election budget is not yet available to test the fiscal posture. Project announcements do not establish future production, royalties or net public benefits.

Can Canada keep its pension promises? · Recent record: 2026-10-13 to 2026-11-11. The window follows recorded checks, material corrections and selected analyses. Qualification and wording notices do not move it.

Filter evidence readings by topic

Recent evidence readings

No evidence readings were recorded for this selection in this window. Showing the 1 most recent earlier readings instead; their dates remain below.

Change type and importance are separate editorial decisions. An issuer revision can be material or minor; a checked-unchanged reading is still a finding. Minor changes include housekeeping only when the recorded effect warrants that description.

Analysis update · Material change

New readingDated 2026-10-05evidence 2026-10-05material

CPP and QPP actuarial results support financing under the reports’ assumptions. That finding leaves a separate question: whether pension benefits and other household resources are enough to live on.

More on this question: Can Canada keep its pension promises? →

Why it stands: The page distinguishes revised and conditional CPP figures, Québec’s amended valuation, and the older OAS projection financed from general revenues.

Pension funding and retirement adequacy can now be followed as separate parts of one public question.

Trigger recorded for this reading: A new actuarial valuation, independently established legislative change, or qualified household adequacy evidence.

Limit: Conditional report scenarios do not establish enactment. OAS figures remain projections from the valuation as at December 31, 2021, not observed spending or a new 2026 forecast.

Reads onto the Big Question it bears on

Monthly evidence archives

Site-wide corrections and wording amendments

Record-dated corrections: 2026-10-13 to 2026-11-11. Material qualification notices: 2026-10-13 to 2026-11-11. Minor wording notices: 2026-10-13 to 2026-11-11.

These notices change published explanations, claims or wording. They do not report new observations. Each link preserves what was wrong, the replacement and its effect.

Material corrections and withdrawals in the evidence log

Minor wording amendments (1) — no analytical conclusion changes

Full corrections record →

Recorded release calendar — checked through 2026-11-11

This calendar retains the log’s original check date. Dates and then-future descriptions below are not a new check of an issuer’s schedule.

Official releases that could change the answer — next 14 days

DateIssuerReleaseWhat it could changeProducts
2026-11-12Statistics CanadaBuilding permits, September 2026 Confirmed dateThe next unadjusted dwelling-unit count and prior revisions. Date stated in the issuer’s October 14 August permits release.Canadian Capacity Monitor · Housing shortage (Big Question)
2026-11-16Statistics CanadaConsumer Price Index, October 2026 Confirmed dateThe matched-month price, rent, core and wage comparison. Date stated in the September issuer release captured October 19.Housing shortage (Big Question) · The price of everything: one headline rate, and the components underneath it

Just beyond 14 days

DateIssuerReleaseWhat it could changeProducts
2026-11-27Statistics CanadaNational Accounts (GDP and gross fixed capital formation), Q3 2026 Provisional — typical cadenceWhether the turn in real GDP per person holds for a second quarter, whether output per worker keeps adding, and whether the per-person level finally passes its 2022 Q3 record; on the capital side, a third quarter of 2026 investment, still one quarter short of a calendar year. The issuer may also restate the two quarters this release just settled. Date provisional: it follows the issuer's observed quarterly cadence of publishing about two months after the quarter ends, and no source captured for these readings pins it.Investment into productivity (Big Question) · Living standards (Big Question) · The capital behind each worker: the investment record, and the productivity record beside it · The anatomy of Canadian living standards
2026-12-08Statistics CanadaCanadian international merchandise trade, October 2026 Confirmed dateThe next matched trade month and historical revisions. Date stated in the captured November 4 issuer article.US Exposure Monitor · Sell beyond the us (Big Question) · Canada's exports and the United States: the record break, and where the difference went
2026-12-15Environment and Climate Change CanadaGreenhouse gas and air pollutant emissions projections report and target-accounting-basis update (adds the 2024 accounting-basis observation) Provisional — typical cadenceThe delivered-share and pace-ratio readings on the target-accounting basis, the With Measures/With Additional Measures 2030 projections and their gap to the target band, and the 2026 interim-objective scenario check -- the principal settlement event for this Brief's first re-reading.Climate account (Big Question) · The distance still to travel
2026-12-31Environment and Climate Change Canada / UNFCCCCanada's second Biennial Transparency Report (statutory Paris Agreement deadline) Confirmed dateCorroborates or updates the LULUCF accounting-contribution methodology and the target-accounting statements this Brief cites; carried unresolved if it lands before this Brief can ingest it.Climate account (Big Question) · The distance still to travel
2027-04-15Environment and Climate Change CanadaNational Inventory Report, next edition (adds the 2025 gross-inventory observed year) Provisional — typical cadenceThe gross-inventory basis's delivered-share and pace-ratio readings, the seven-sector ledger, and the moving-baseline chapter's own comparison; a full re-ingest of the new vintage with the prior vintage preserved, revision separated from new-year movement.Climate account (Big Question) · The distance still to travel
2027-12-15Environment and Climate Change CanadaStatutory progress report on the 2030 Emissions Reduction Plan, next edition Provisional — typical cadenceThe official-assessment quotations this Brief cites and the secondary sector indicators; never a verdict source by itself.Climate account (Big Question) · The distance still to travel

Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca)