Statistics Canada's measured electricity record: annual installed capacity through 2025 and monthly generation through July 2026, at the national all-producers total

Canada's measured electricity system as Statistics Canada's surveys state it: installed generating capacity (table 25-10-0022-01, annual, through reference year 2025, released 2026-10-19) and electric power generation (table 25-10-0015-01, monthly, through reference month July 2026, released 2026-09-29), both at the Canada / total-all-classes-of-producer / total-all-types coordinate. This is the measured side of the electricity record -- what the system has actually installed and generated -- kept deliberately separate from any issuer's modelled pathway.

On this page

A Resolution record follows one institution's figures for a defined quantity. It may contain projections, estimates or measured observations. Each version held here keeps its publication date and source, so a newer figure does not erase the earlier one. What is a Resolution record? →

Maintained record. This page preserves successive versions of an official record. It makes no projection and awaits no forecast verdict. Revisions remain visible, and provisional figures retain that status.

The lineage

VintageIssuerPublishedPositionSource
2026-04 reference month (released 2026-06-30)Statistics Canada2026-06-30supersededSource → · accessed 2026-07-17
2024 reference year (released 2025-10-27)Statistics Canada2025-10-27supersededSource → · accessed 2026-07-17
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30supersededSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30supersededSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30supersededSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30supersededSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
July 2026 reference month; released September 29, captured September 29, 2026Statistics Canada2026-09-29currentSource → · accessed 2026-09-29
July 2026 reference month; released September 29, captured September 29, 2026Statistics Canada2026-09-29currentSource → · accessed 2026-09-29
July 2026 reference month; released September 29, captured September 29, 2026Statistics Canada2026-09-29currentSource → · accessed 2026-09-29
July 2026 reference month; released September 29, captured September 29, 2026Statistics Canada2026-09-29currentSource → · accessed 2026-09-29
July 2026 reference month; released September 29, captured September 29, 2026Statistics Canada2026-09-29currentSource → · accessed 2026-09-29
2025 reference year; October 19, 2026 edition including revised 2024Statistics Canada2026-10-19currentSource → · accessed 2026-10-19
VintagePeriodValueRoleAssuranceBasis
2024 reference year (released 2025-10-27)2014 (installed capacity)135,088.0 MWinstitutional estimate——
2024 reference year (released 2025-10-27)2023 (installed capacity)150,937.7 MWinstitutional estimate——
2024 reference year (released 2025-10-27)2024 (installed capacity; latest published reference year)156,388.5 MWinstitutional estimate——
2026-04 reference month (released 2026-06-30)Calendar year 2023 (generation)615,332.8 GWhinstitutional estimate——
2026-04 reference month (released 2026-06-30)Calendar year 2024 (generation)609,488.1 GWhinstitutional estimate——
2026-04 reference month (released 2026-06-30)Calendar year 2025 (generation)625,212.4 GWhinstitutional estimate——
2026-04 reference month (released 2026-06-30)Twelve months ending April 2026 (generation)625,010.7 GWhinstitutional estimate——
2026-04 reference month (released 2026-06-30)Twelve months ending April 2025 (generation)626,923.6 GWhinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (Quebec: total installed capacity)44,151.3 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (Quebec: total installed capacity)46,307.4 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (Quebec: total installed capacity)46,274.9 MWinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (Quebec: total electricity generation)188,463.7 GWhinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (Quebec: total electricity generation)194,703.8 GWhinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (Ontario: total installed capacity)35,322.3 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (Ontario: total installed capacity)40,248.3 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (Ontario: total installed capacity)42,026.4 MWinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (Ontario: total electricity generation)171,188.2 GWhinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (Ontario: total electricity generation)167,612.8 GWhinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (Alberta: total installed capacity)13,909.0 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (Alberta: total installed capacity)16,936.2 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (Alberta: total installed capacity)20,180.5 MWinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (Alberta: total electricity generation)86,071.4 GWhinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (Alberta: total electricity generation)83,318.8 GWhinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (British Columbia: total installed capacity)16,041.7 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (British Columbia: total installed capacity)18,680.8 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (British Columbia: total installed capacity)18,780.1 MWinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (British Columbia: total electricity generation)67,322.3 GWhinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (British Columbia: total electricity generation)62,122.9 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2025 (generation)627,557.3 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2026 (generation)634,612.2 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2025 (generation)191,040.4 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2026 (generation)189,705.5 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2025 (generation)170,134.5 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2026 (generation)172,363.0 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2025 (generation)84,914.6 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2026 (generation)85,420.8 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2025 (generation)63,013.4 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2026 (generation)72,685.1 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Calendar year 2023 (generation)615,332.8 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Calendar year 2024 (generation)609,488.1 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Calendar year 2025 (generation)625,212.4 GWhinstitutional estimate——
2025 reference year; October 19, 2026 edition including revised 20242014 installed capacity (October 19, 2026 edition)135,088.0 MWinstitutional estimate——
2025 reference year; October 19, 2026 edition including revised 20242023 installed capacity (October 19, 2026 edition)150,937.7 MWinstitutional estimate——
2025 reference year; October 19, 2026 edition including revised 20242024 installed capacity (October 19, 2026 edition; revised)155,749.4 MWinstitutional estimate——
2025 reference year; October 19, 2026 edition including revised 20242025 installed capacity (October 19, 2026 edition)155,906.4 MWinstitutional estimate——

Comparisons

This record shows what an institution published and how its figures compare across versions or with later outcomes. It does not rank institutions or grade their forecasting ability.

ComparisonCompared periods and editionsDifference (stated convention)Basis and convention
Installed capacity, 2023 to 20242023 (installed capacity) · edition: 2024 reference year (released 2025-10-27) (institutional estimate 150,937.7 MW) vs. 2024 (installed capacity; latest published reference year) · edition: 2024 reference year (released 2025-10-27) (institutional estimate 156,388.5 MW)+5,450.8 MWsame issuer. Numeric difference: the 2024 level minus the 2023 level, in megawatts. Positive means capacity was added on the survey's own published levels.
Installed capacity, 2014 to 2024 (ten years)2014 (installed capacity) · edition: 2024 reference year (released 2025-10-27) (institutional estimate 135,088.0 MW) vs. 2024 (installed capacity; latest published reference year) · edition: 2024 reference year (released 2025-10-27) (institutional estimate 156,388.5 MW)+21,300.5 MWsame issuer. Numeric difference: the 2024 level minus the 2014 level, in megawatts -- the decade change on the survey's own published levels.
Generation, calendar 2023 to calendar 2024Calendar year 2023 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 615,332.8 GWh) vs. Calendar year 2024 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 609,488.1 GWh)-5,844.7 GWhsame issuer. Numeric difference: calendar 2024 generation minus calendar 2023, in gigawatt hours. Raw totals; annual generation reflects demand and conditions in each year, not generating capability alone.
Generation, calendar 2023 to calendar 2025Calendar year 2023 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 615,332.8 GWh) vs. Calendar year 2025 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 625,212.4 GWh)+9,879.6 GWhsame issuer. Numeric difference: calendar 2025 generation minus calendar 2023, in gigawatt hours -- the two-year change since the reference year where the CER dataset's recorded history ends. Computed entirely within this table's own basis.
Generation, trailing twelve months to July 2026 vs the year-earlier windowTwelve months ending July 2025 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 627,557.3 GWh) vs. Twelve months ending July 2026 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 634,612.2 GWh)+7,054.9 GWhsame issuer. Numeric difference: the twelve months ending July 2026 minus the twelve months ending July 2025, in gigawatt hours -- the freshest like-for-like window the published series supports.
Installed capacity, Quebec: 2023 to 20242023 (Quebec: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 46,307.4 MW) vs. 2024 (Quebec: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 46,274.9 MW)-32.5 MWsame issuer. Numeric difference: 2024 minus 2023, in megawatts, on the survey basis only -- never compared with the projection dataset's levels.
Installed capacity, Quebec: the 2014-2024 decade2014 (Quebec: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 44,151.3 MW) vs. 2024 (Quebec: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 46,274.9 MW)+2,123.6 MWsame issuer. Numeric difference: 2024 minus 2014, in megawatts -- the same decade window the national capacity record states, on the survey basis only.
Generation, Quebec: trailing twelve months ending July 2026 against the year-earlier windowTwelve months ending July 2025 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 191,040.4 GWh) vs. Twelve months ending July 2026 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 189,705.5 GWh)-1,334.9 GWhsame issuer. Numeric difference: the window ending July 2026 minus the window ending July 2025, in gigawatt hours, on the survey basis only -- the same paired windows the national record states.
Installed capacity, Ontario: 2023 to 20242023 (Ontario: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 40,248.3 MW) vs. 2024 (Ontario: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 42,026.4 MW)+1,778.1 MWsame issuer. Numeric difference: 2024 minus 2023, in megawatts, on the survey basis only -- never compared with the projection dataset's levels.
Installed capacity, Ontario: the 2014-2024 decade2014 (Ontario: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 35,322.3 MW) vs. 2024 (Ontario: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 42,026.4 MW)+6,704.1 MWsame issuer. Numeric difference: 2024 minus 2014, in megawatts -- the same decade window the national capacity record states, on the survey basis only.
Generation, Ontario: trailing twelve months ending July 2026 against the year-earlier windowTwelve months ending July 2025 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 170,134.5 GWh) vs. Twelve months ending July 2026 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 172,363.0 GWh)+2,228.5 GWhsame issuer. Numeric difference: the window ending July 2026 minus the window ending July 2025, in gigawatt hours, on the survey basis only -- the same paired windows the national record states.
Installed capacity, Alberta: 2023 to 20242023 (Alberta: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 16,936.2 MW) vs. 2024 (Alberta: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 20,180.5 MW)+3,244.3 MWsame issuer. Numeric difference: 2024 minus 2023, in megawatts, on the survey basis only -- never compared with the projection dataset's levels.
Installed capacity, Alberta: the 2014-2024 decade2014 (Alberta: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 13,909.0 MW) vs. 2024 (Alberta: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 20,180.5 MW)+6,271.5 MWsame issuer. Numeric difference: 2024 minus 2014, in megawatts -- the same decade window the national capacity record states, on the survey basis only.
Generation, Alberta: trailing twelve months ending July 2026 against the year-earlier windowTwelve months ending July 2025 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 84,914.6 GWh) vs. Twelve months ending July 2026 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 85,420.8 GWh)+506.2 GWhsame issuer. Numeric difference: the window ending July 2026 minus the window ending July 2025, in gigawatt hours, on the survey basis only -- the same paired windows the national record states.
Installed capacity, British Columbia: 2023 to 20242023 (British Columbia: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 18,680.8 MW) vs. 2024 (British Columbia: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 18,780.1 MW)+99.3 MWsame issuer. Numeric difference: 2024 minus 2023, in megawatts, on the survey basis only -- never compared with the projection dataset's levels.
Installed capacity, British Columbia: the 2014-2024 decade2014 (British Columbia: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 16,041.7 MW) vs. 2024 (British Columbia: total installed capacity) · edition: Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 18,780.1 MW)+2,738.4 MWsame issuer. Numeric difference: 2024 minus 2014, in megawatts -- the same decade window the national capacity record states, on the survey basis only.
Generation, British Columbia: trailing twelve months ending July 2026 against the year-earlier windowTwelve months ending July 2025 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 63,013.4 GWh) vs. Twelve months ending July 2026 (generation) · edition: July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 72,685.1 GWh)+9,671.7 GWhsame issuer. Numeric difference: the window ending July 2026 minus the window ending July 2025, in gigawatt hours, on the survey basis only -- the same paired windows the national record states.
Generation, calendar 2023 to calendar 2024Calendar year 2023 (generation) · edition: 2026-04 reference month (released 2026-06-30) (institutional estimate 615,332.8 GWh) vs. Calendar year 2024 (generation) · edition: 2026-04 reference month (released 2026-06-30) (institutional estimate 609,488.1 GWh)-5,844.7 GWhsame issuer. Numeric difference: calendar 2024 generation minus calendar 2023, in gigawatt hours. Raw totals; annual generation reflects demand and conditions in each year, not generating capability alone.
Generation, calendar 2023 to calendar 2025Calendar year 2023 (generation) · edition: 2026-04 reference month (released 2026-06-30) (institutional estimate 615,332.8 GWh) vs. Calendar year 2025 (generation) · edition: 2026-04 reference month (released 2026-06-30) (institutional estimate 625,212.4 GWh)+9,879.6 GWhsame issuer. Numeric difference: calendar 2025 generation minus calendar 2023, in gigawatt hours -- the two-year change since the reference year where the CER dataset's recorded history ends. Computed entirely within this table's own basis.
Generation, trailing twelve months to April 2026 vs the year-earlier windowTwelve months ending April 2025 (generation) · edition: 2026-04 reference month (released 2026-06-30) (institutional estimate 626,923.6 GWh) vs. Twelve months ending April 2026 (generation) · edition: 2026-04 reference month (released 2026-06-30) (institutional estimate 625,010.7 GWh)-1,912.9 GWhsame issuer. Numeric difference: the twelve months ending April 2026 minus the twelve months ending April 2025, in gigawatt hours -- the freshest like-for-like window the published series supports.
Generation, Quebec: trailing twelve months ending April 2026 against the year-earlier windowTwelve months ending April 2025 (Quebec: total electricity generation) · edition: Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 194,703.8 GWh) vs. Twelve months ending April 2026 (Quebec: total electricity generation) · edition: Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 188,463.7 GWh)-6,240.1 GWhsame issuer. Numeric difference: the window ending April 2026 minus the window ending April 2025, in gigawatt hours, on the survey basis only -- the same paired windows the national record states.
Generation, Ontario: trailing twelve months ending April 2026 against the year-earlier windowTwelve months ending April 2025 (Ontario: total electricity generation) · edition: Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 167,612.8 GWh) vs. Twelve months ending April 2026 (Ontario: total electricity generation) · edition: Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 171,188.2 GWh)+3,575.4 GWhsame issuer. Numeric difference: the window ending April 2026 minus the window ending April 2025, in gigawatt hours, on the survey basis only -- the same paired windows the national record states.
Generation, Alberta: trailing twelve months ending April 2026 against the year-earlier windowTwelve months ending April 2025 (Alberta: total electricity generation) · edition: Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 83,318.8 GWh) vs. Twelve months ending April 2026 (Alberta: total electricity generation) · edition: Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 86,071.4 GWh)+2,752.6 GWhsame issuer. Numeric difference: the window ending April 2026 minus the window ending April 2025, in gigawatt hours, on the survey basis only -- the same paired windows the national record states.
Generation, British Columbia: trailing twelve months ending April 2026 against the year-earlier windowTwelve months ending April 2025 (British Columbia: total electricity generation) · edition: Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 62,122.9 GWh) vs. Twelve months ending April 2026 (British Columbia: total electricity generation) · edition: Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 67,322.3 GWh)+5,199.4 GWhsame issuer. Numeric difference: the window ending April 2026 minus the window ending April 2025, in gigawatt hours, on the survey basis only -- the same paired windows the national record states.
Installed capacity, 2014 to 2025 (October 19, 2026 edition)2014 installed capacity (October 19, 2026 edition) · edition: 2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 135,088.0 MW) vs. 2025 installed capacity (October 19, 2026 edition) · edition: 2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 155,906.4 MW)+20,818.4 MWsame issuer. Same-edition difference: 2025 minus 2014, kilowatts divided by 1,000 to MW; no intermediate rounding.
Installed capacity, 2023 to 2024 (October 19, 2026 edition)2023 installed capacity (October 19, 2026 edition) · edition: 2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 150,937.7 MW) vs. 2024 installed capacity (October 19, 2026 edition; revised) · edition: 2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 155,749.4 MW)+4,811.7 MWsame issuer. Same-edition difference: 2024 minus 2023, kilowatts divided by 1,000 to MW; no intermediate rounding.
Installed capacity, 2024 to 2025 (October 19, 2026 edition)2024 installed capacity (October 19, 2026 edition; revised) · edition: 2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 155,749.4 MW) vs. 2025 installed capacity (October 19, 2026 edition) · edition: 2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 155,906.4 MW)+157.0 MWsame issuer. Same-edition difference: 2025 minus 2024, kilowatts divided by 1,000 to MW; no intermediate rounding.
Evidence qualifications (8)
Latest source: Statistics Canada's measured electricity record: annual installed capacity through 2025 and monthly generation through July 2026, at the national all-producers total · accessed 2026-09-29

Related on this site

This record shows what an institution published and how its figures compare across versions or with later outcomes. It does not rank institutions or grade their forecasting ability.

This is the current public record for this lineage. See Work with Countability for a commissioned projection-resolution question.

Work with Countability