Resolution
Statistics CanadaclimateMaintained recordCurrent

Statistics Canada's measured electricity record: annual installed capacity through 2024 and monthly generation through April 2026, at the national all-producers total

Canada's measured electricity system as Statistics Canada's surveys state it: installed generating capacity (table 25-10-0022-01, annual, through reference year 2024, released 2025-10-27) and electric power generation (table 25-10-0015-01, monthly, through reference month April 2026, released 2026-06-30), both at the Canada / total-all-classes-of-producer / total-all-types coordinate. This is the measured side of the electricity record -- what the system has actually installed and generated -- kept deliberately separate from any issuer's modelled pathway.

A Resolution record holds one institution's own published figures for a single, specific quantity — a projection, an estimate, or a measured record — across every vintage in which that institution restated it. Each time an issuer publishes a new budget, report, or release, an earlier figure does not disappear from the record; it is preserved exactly as it was first published, dated and cited, alongside the newer one. What is a Resolution record? →

Maintained record. This lineage preserves an official record version by version — observations, estimates, or benchmarks its issuer restated over time. It projects nothing, so no settlement is pending; where a figure can still be revised, the page says so. How the numbers moved between versions is the evidence this lineage exists to keep.

The lineage

VintageIssuerPublishedPositionSource
2026-04 reference month (released 2026-06-30)Statistics Canada2026-06-30currentSource → · accessed 2026-07-17
2024 reference year (released 2025-10-27)Statistics Canada2025-10-27currentSource → · accessed 2026-07-17
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30currentSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30currentSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30currentSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30currentSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
VintagePeriodValueRoleAssuranceBasis
2024 reference year (released 2025-10-27)2014 (installed capacity)135,088.0 MWinstitutional estimate
2024 reference year (released 2025-10-27)2023 (installed capacity)150,937.7 MWinstitutional estimate
2024 reference year (released 2025-10-27)2024 (installed capacity; latest published reference year)156,388.5 MWinstitutional estimate
2026-04 reference month (released 2026-06-30)Calendar year 2023 (generation)615,332.8 GWhinstitutional estimate
2026-04 reference month (released 2026-06-30)Calendar year 2024 (generation)609,488.1 GWhinstitutional estimate
2026-04 reference month (released 2026-06-30)Calendar year 2025 (generation)625,212.4 GWhinstitutional estimate
2026-04 reference month (released 2026-06-30)Twelve months ending April 2026 (generation)625,010.7 GWhinstitutional estimate
2026-04 reference month (released 2026-06-30)Twelve months ending April 2025 (generation)626,923.6 GWhinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (Quebec: total installed capacity)44,151.3 MWinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (Quebec: total installed capacity)46,307.4 MWinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (Quebec: total installed capacity)46,274.9 MWinstitutional estimate
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (Quebec: total electricity generation)188,463.7 GWhinstitutional estimate
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (Quebec: total electricity generation)194,703.8 GWhinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (Ontario: total installed capacity)35,322.3 MWinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (Ontario: total installed capacity)40,248.3 MWinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (Ontario: total installed capacity)42,026.4 MWinstitutional estimate
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (Ontario: total electricity generation)171,188.2 GWhinstitutional estimate
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (Ontario: total electricity generation)167,612.8 GWhinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (Alberta: total installed capacity)13,909.0 MWinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (Alberta: total installed capacity)16,936.2 MWinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (Alberta: total installed capacity)20,180.5 MWinstitutional estimate
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (Alberta: total electricity generation)86,071.4 GWhinstitutional estimate
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (Alberta: total electricity generation)83,318.8 GWhinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (British Columbia: total installed capacity)16,041.7 MWinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (British Columbia: total installed capacity)18,680.8 MWinstitutional estimate
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (British Columbia: total installed capacity)18,780.1 MWinstitutional estimate
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (British Columbia: total electricity generation)67,322.3 GWhinstitutional estimate
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (British Columbia: total electricity generation)62,122.9 GWhinstitutional estimate

Movement between vintages

A record, not a ranking: this entry states what was published and how it compares to what followed. It never says who was right, which institution performed better, or grades a forecaster's competence.

ComparisonCompared vintagesMovementBasis
Installed capacity, 2023 to 20242024 reference year (released 2025-10-27) (institutional estimate 150,937.7 MW) vs. 2024 reference year (released 2025-10-27) (institutional estimate 156,388.5 MW)+5,450.8 MWsame issuer
Installed capacity, 2014 to 2024 (ten years)2024 reference year (released 2025-10-27) (institutional estimate 135,088.0 MW) vs. 2024 reference year (released 2025-10-27) (institutional estimate 156,388.5 MW)+21,300.5 MWsame issuer
Generation, calendar 2023 to calendar 20242026-04 reference month (released 2026-06-30) (institutional estimate 615,332.8 GWh) vs. 2026-04 reference month (released 2026-06-30) (institutional estimate 609,488.1 GWh)-5,844.7 GWhsame issuer
Generation, calendar 2023 to calendar 20252026-04 reference month (released 2026-06-30) (institutional estimate 615,332.8 GWh) vs. 2026-04 reference month (released 2026-06-30) (institutional estimate 625,212.4 GWh)+9,879.6 GWhsame issuer
Generation, trailing twelve months to April 2026 vs the year-earlier window2026-04 reference month (released 2026-06-30) (institutional estimate 626,923.6 GWh) vs. 2026-04 reference month (released 2026-06-30) (institutional estimate 625,010.7 GWh)-1,912.9 GWhsame issuer
Installed capacity, Quebec: 2023 to 2024Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 46,307.4 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 46,274.9 MW)-32.5 MWsame issuer
Installed capacity, Quebec: the 2014-2024 decadeReference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 44,151.3 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 46,274.9 MW)+2,123.6 MWsame issuer
Generation, Quebec: trailing twelve months ending April 2026 against the year-earlier windowReference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 194,703.8 GWh) vs. Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 188,463.7 GWh)-6,240.1 GWhsame issuer
Installed capacity, Ontario: 2023 to 2024Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 40,248.3 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 42,026.4 MW)+1,778.1 MWsame issuer
Installed capacity, Ontario: the 2014-2024 decadeReference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 35,322.3 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 42,026.4 MW)+6,704.1 MWsame issuer
Generation, Ontario: trailing twelve months ending April 2026 against the year-earlier windowReference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 167,612.8 GWh) vs. Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 171,188.2 GWh)+3,575.4 GWhsame issuer
Installed capacity, Alberta: 2023 to 2024Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 16,936.2 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 20,180.5 MW)+3,244.3 MWsame issuer
Installed capacity, Alberta: the 2014-2024 decadeReference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 13,909.0 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 20,180.5 MW)+6,271.5 MWsame issuer
Generation, Alberta: trailing twelve months ending April 2026 against the year-earlier windowReference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 83,318.8 GWh) vs. Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 86,071.4 GWh)+2,752.6 GWhsame issuer
Installed capacity, British Columbia: 2023 to 2024Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 18,680.8 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 18,780.1 MW)+99.3 MWsame issuer
Installed capacity, British Columbia: the 2014-2024 decadeReference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 16,041.7 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 18,780.1 MW)+2,738.4 MWsame issuer
Generation, British Columbia: trailing twelve months ending April 2026 against the year-earlier windowReference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 62,122.9 GWh) vs. Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 67,322.3 GWh)+5,199.4 GWhsame issuer
Evidence qualifications (7)
Latest source: Statistics Canada's measured electricity record: annual installed capacity through 2024 and monthly generation through April 2026, at the national all-producers total · accessed 2026-07-17

Related on this site

A record, not a ranking: this entry states what was published and how it compares to what followed. It never says who was right, which institution performed better, or grades a forecaster's competence.

This is the current public record for this lineage. See Work with Countability for a commissioned projection-resolution question.